Montreal officials announced on Saturday that construction work aimed at improving water‑conservation on Atwater Avenue is running behind schedule. The city asked households and businesses in the area to keep limiting their water use while the project remains unfinished.

The work on Atwater Avenue forms part of a broader series of water‑saving initiatives that the municipal government has been rolling out across the city. Although the specific reasons for the delay were not detailed, the extension of the construction period means that the expected benefits of reduced water consumption will not be realized as quickly as planned.

City representatives emphasized that the continuation of voluntary water‑saving measures by the public is essential to sustain the overall objectives of the water‑conservation program. They reminded residents that even modest reductions in daily usage can help offset the temporary shortfall caused by the delayed infrastructure improvements.

The Atwater Avenue project is one of several efforts underway to modernize Montreal’s water system, aiming to lower overall demand and improve the efficiency of distribution. The city’s strategy includes upgrading pipes, installing smart meters, and promoting public awareness about responsible water use.

Authorities indicated that they will monitor the progress of the Atwater Avenue work closely and provide updates as the situation evolves. In the meantime, they urged the community to maintain the water‑saving habits that have been encouraged throughout the city’s campaign, such as fixing leaks promptly, using low‑flow fixtures, and limiting non‑essential outdoor watering.

The city’s call for continued conservation reflects its commitment to managing water resources responsibly, even when infrastructure projects encounter setbacks. Residents are asked to stay informed through official channels and to cooperate with the ongoing efforts to protect Montreal’s water supply.