Mayors Inaugurate West Island Indoor Aquatic Centre
The mayor of Montreal and the Pierrefonds borough mayor inaugurated a $70 million indoor pool on September 28, 2026, with full operation slated for 2027 after a long planning period.
GMNA Montreal
On September 28, 2026, the mayor of Montreal and the mayor of the borough of Pierrefonds opened a brand‑new indoor aquatic centre in Pierrefonds, on the city’s West Island. The facility was built at a cost of more than $70 million and is expected to be fully operational in 2027.
The indoor pool project, planned for decades, finally broke ground after years of delay.