A lane in the north tube of the Louis‑Hippolyte‑La Fontaine tunnel is set to reopen on Dec. 1, bringing the total number of open lanes to four.
The tunnel, which links the Island of Montreal with the South Shore in Greater Montreal, has been operating with reduced capacity. Restoring the lane is intended to ease traffic congestion during the winter months and improve flow for drivers in the Montreal area.
