The northbound La Fontaine Tunnel was closed for roughly three hours after a lane‑control light was struck, sending debris onto the roadway, according to Quebec 511.

The shutdown began at about 10:30 a.m. and the tunnel reopened to traffic around 1:45 p.m. after the debris was cleared and the light repaired.

The tunnel links Montreal with the South Shore and serves as a major commuter corridor.