The City of Outremont announced on September 1 that a portion of Irma‑Le Vasseur park will be designated for exclusive use by the adjacent elementary school during regular class hours and after‑school programs. The same area will also serve as a rain‑water sponge, absorbing runoff during periods of heavy rain.

Municipal officials explained that the reallocation is intended to provide the school with additional outdoor space for activities while simultaneously enhancing the neighbourhood’s ability to manage storm‑water. By allowing the park segment to retain water temporarily, the city aims to reduce the volume of runoff that reaches nearby streets and drainage systems.

The designated area remains part of Irma‑Le Vasseur park, but its access will be limited to school‑related activities during the day. Outside of those times, the space will be open to the public, offering the community continued access to green space. The dual‑purpose design reflects the municipality’s effort to balance recreational needs with environmental considerations.

Outremont residents were informed that the change will not alter the overall layout of the park, and no new construction is planned as part of the initiative. The city’s storm‑water strategy includes using existing parkland to capture and slowly release rainwater, a method that can mitigate flooding risks in the surrounding area.

The elementary school is located directly next to Irma‑Le Vasseur park, making the newly allocated section convenient for students and staff. The arrangement is set to begin after the announcement and will be evaluated for effectiveness in both educational use and water management.

The move aligns with broader municipal objectives to make better use of public spaces for community benefit while addressing environmental challenges such as heavy rainfall and runoff. The city will monitor the performance of the rain‑water sponge function and may adjust the program based on observed outcomes.