Local road crews will shut down a segment of Moe Road in Clifton Park on Friday, August 21, 2026, for several hours while they address damage caused by recent heavy rain. The temporary closure is intended to allow workers to complete flood‑damage repairs safely and efficiently.

The work focuses on a stretch of the road that experienced surface erosion and pooling after the rainstorm that moved through the area earlier this week. Crews will remove compromised material, reinforce the pavement, and improve drainage to prevent future flooding. The repairs are part of the town’s ongoing effort to maintain road conditions after extreme weather events.

Motorists are advised to plan alternate routes while the closure is in effect. Nearby streets such as Oak Street and River Road can serve as detours, though drivers should expect some additional travel time. Signage will be posted at the entrance to the closed section, and traffic control personnel will be on site to guide vehicles safely around the work zone.

The closure is expected to last only a few hours, after which the road will reopen to normal traffic. Officials emphasize that the limited downtime is necessary to ensure the long‑term stability of Moe Road and to reduce the risk of future disruptions caused by flooding. Residents and commuters are encouraged to stay informed through local traffic updates throughout the day.

This repair effort follows a period of unusually heavy precipitation that strained the region’s infrastructure. By addressing the damage promptly, the town aims to maintain safe travel conditions and protect the roadway from further deterioration during the remainder of the summer season.