Eastwick Flood Barrier Plans Stalled After Levee Rejection
Temporary flood barriers in Eastwick have stalled because a permanent levee was deemed unviable, leaving the area reliant on interim HESCO barriers. The neighborhood has a history of flooding.
GMNA Philadelphia
The city’s effort to place temporary HESCO‑style flood barriers in Philadelphia’s Eastwick neighborhood has run into a problem after a proposed permanent levee was judged unfeasible.
Eastwick has long dealt with flooding, and after the permanent levee plan was dismissed, officials turned to the temporary HESCO barriers as an interim solution.