The New Jersey Department of Transportation announced that the $155.1 million improvement effort along the Route 70 corridor in South Jersey is approaching its final stages. The work, which spans Route 70 and Route 38 to Cooper Avenue, includes upgrades to gas and water mains, the replacement of aging infrastructure, and the installation of new traffic‑signal systems at 27 intersections.
The project was launched in 2022 with the goal of modernizing utilities and traffic controls along this heavily traveled corridor. Over the past four years, contractors have focused on replacing outdated gas and water pipelines, reinforcing the reliability of essential services for residents and businesses along the route. At the same time, traffic‑signal equipment that had reached the end of its service life has been swapped out for newer, more responsive units designed to improve vehicular flow and safety.
The $155.1 million investment reflects the state’s commitment to maintaining critical transportation links in South Jersey. By addressing both utility and traffic‑management needs in a single coordinated effort, the Department of Transportation aims to reduce the likelihood of service disruptions and traffic incidents that can arise from deteriorating infrastructure. The comprehensive nature of the work—covering utility upgrades, signal replacements, and roadway improvements—was intended to deliver lasting benefits for commuters and local communities.
As the final phases of construction wind down, the Department expects the remaining tasks to be completed within the next few months. Upon full completion, the Route 70 corridor will feature updated utility lines, modern traffic‑signal technology, and enhanced safety measures at each of the 27 intersections, providing a more reliable and secure travel experience for the region’s motorists.
