Bridges spanning the Chicago River between DuSable Lake Shore Drive and 18th Street will be lifted beginning September 30, 2026, with vehicle traffic temporarily halted until mid‑November to permit boat passage.

Each fall, the city conducts this operation, raising several movable bridges on the river to accommodate the seasonal increase in water traffic.